Phase 3
- MCR0001 - PCI00241 Temp Power Prep at North Substation
- MCR0002 PCI00244 PH3 ASI 3
- MCR0003 PCI00245 PH3 ASI 4
- MCR0004 PCI00246 PH3 ASI 5
- MCR0005 PCI00247 PH3 ASI 6
- MCR0006 PCI00248 PH3 ASI 7
- MCR0007 PCI00249 PH3 ASI 8
- MCR0008 PCI00250 PH3 ASI 9
- MCR0008b PCI00250 PH3 ASI 9 - Electrical Costs Only
- MCR0009 PCI00251 PH3 ASI 10
- MCR0010 PCI00270 PH3 ASI 11
- MCR0011 PCI00271 PH3 ASI 12
- MCR0012 PCI00272 PH3 ASI 13
- MCR0013 PCI00281 PH3 ASI 14
- MCR0014 PCI00288 PH3 ASI 15
- MCR0015 Tower VE Lighting Options
- MCR0016 PCI00304 PH3 ASI 16 - Ceiling Revisions
- MCR0017 PCI00310 PH3 ASI 17
- MCR0018 PCI00324 PH3 ASI 18
- MCR0019 PCI00325 PH3 ASI 19
- MCR0020 PCI00326 PH3 ASI 20r
- MCR0021 PCI00328 PH3 ASI 21
- MCR0022 PCI00329 PH3 ASI 22
- MCR0024 PCI00337 PH3 ASI 24
- MCR0025 PCI00338 PH3 ASI 25
- MCR0026 PCI00345 PH3 ASI 26
- MCR0027 PCI00354 PH3 ASI 27
- MCR0028 PCI00355 PH3 RFI's 26 & 167 - Medical Equipment Leaveouts
- MCR0030 PCI00364 PH3 ASI 28
- MCR0030a PCI00364a PH3 ASI 28 - Corbin's
- MCR0031 PCI00370 PH3 ASI 29
- MCR0002a PCI00244a PH3 ASI 3 - Corbin's
- MCR0010b PCI00270b PH3 ASI 11 - Corbin's
- MCR0012b PCI00272b PH3 ASI 13 - Corbin's
- MCR0016a PCI00304a PH3 ASI 16 - Corbin's
- MCR0021b PCI00328b PH3 ASI 21 - Corbin's
- MCR0023a PCI00332a PH3 ASI 23 - Corbin's
- MCR0026a PCI00345a PH3 ASI 26 - Corbin's
- MCR0019a PCI00325a PH3 ASI 19 - Steel
- MCR0018a PCI00324a PH3 ASI 18 - ISEC
- MCR0021c PCI00328c PH3 ASI 21 - ISEC
- MCR0027a PCI00354a PH3 ASI 27 - ISEC
- MCR0032 PCI00386 PH3 ASI 30
- MCR0033 PCI00387 PH3 ASI 31
- MCR0034 PCI00393 PH3 RFI 128 Added Plywood @ Comm & MDF Rooms
- MCR0010a PCI00270 PH3 ASI 11 - Concrete ONLY
- MCR0010 PCI00270 PH3 ASI 11
- MCR0004a PCI00246a PH3 ASI 5 - Corbin's
- MCR0005b PCI00247b PH3 ASI 6 - Corbin's
- MCR0007a PCI00249a PH3 ASI 8 - Partial Scope
- MCR0005c PCI00247C PH3 ASI 6 - Partial Scope
- MCR0036 PCI00394 PH3 ASI 32
- MCR0002b PCI00244B PH3 ASI 3 - Partial Scope
- MCR0038 PH3 PCI00439 ASI #33
- MCR0039 PCI00443 PH3 ASI #34
- MCR0040 PCI00444 PH3 ASI #35
- MCR0036a PH3 PCI00394A ASI #32 - Mock-up Wall Glass/Glazing
- MCR0042 PCI00468 PH3 - Issue #168 - Pending UNMH IT request to increase Copper Backbone Capacity
- MCR0041 PCI00445 PH3 ASI #36
- MCR0009A PCI00251A PH3 ASI 10 - Partial Scope
- MCR0030b PCI00364B PH3 ASI #28 - Miller Bonded
- MCR0018c PCI00324C PH3 ASI #18 - Light Fixture Changes and Added BIM Costs - Corbins
- MCR0021 PCI00328 PH3 ASI 21 - Hardware, Sink, HVAC, & Elec Changes plus Ceiling and wall relocation
- MCR0002c PCI00244C PH3 ASI 3 - SWGG/PCI (Sheathing & Alum Door Changes)
- MCR004b PCI00246b PH3 ASI #5 - Ceiling in BBRP and Plumbing Fixtures on Lvl 2
- MCR0009c PCI00251B PH3 ASI #10 - Light Fixture, ESP-100 Water Vault Conduit, Generator, ES402 rgh-in
- MCR0012c PCI00272C PH3 - ASI #13 - PL Casework and Solid Surface Changes
- MCR0019b PCI00325B PH3 ASI #19 - Corbins BIM Modeling and APIC Added FCUs
- MCR0043 PCI00473 PH3 ASI #40
- MCR0044 PCI00474 PH3 ASI #37
- MCR0045 PCI00475 PH3 ASI #41
- MCR0046 PCI00481 PH3 RFI #0321b - Card Readers at Waste Management Yard
- MCR0047 PCI00483 PH3 ASI #38
- MCR0048 PCI00484 PH3 ASI #42
- MCR0049 PCI00487 PH3 - ASI #43 - Misc. MEP Changes and Coordination
- MCR0050 PCI00496 PH3 ASI #44 - Rev. Elev Shaft Opening, Updated Telecom lines, Added Glass Partition
- MCR0051 PCI00500 PH3 ASI #39 - Level 1 Revised Restroom Dimensions
- MCR0052 PCI00508 PH3 ASI #45 - Plenums, Rated Walls, & Misc.
- PCI00522 PH3 ASI #46 - IR Neuro Equip Room, Vert Exp - Rational Analysis, I.T. Copper Backbone
- MCR0054 PCI00523 PH3 ASI #47 - L02 plan layouts / RFI 264d
- MCR0055 PCI00524 PH3 ASI #49 - Detectable rail @ Stair 07, IR added pedestals
- MCR0056 15KV & LV Manhole Extension Allocation
- MCR0002d PCI00244D PH3 ASI #3 - APIC Feeder and Rays Tile Adjustments
- MCR0008 PCI00250 PH3 ASI#9 - Galvanized HSS Posts in the Waste Disposal Yard
- MCR0021d PCI00328d PH3 ASI 21 - Data in ICUs & Aluminum Opngs Hdwe
- MCR0023 PCI00332 PH3 ASI 23
- MCR0053 PCI00522 PH3 ASI #46 - IR Neuro Equip Room, Vert Exp - Rational Analysis, I.T. Copper Backbo
- MCR0073 PCI00566 PH3 - Beaty, Evan Fall Protection and Franklin's Buyout Reconciliation
- MCR0075 PCI00530 PH3 Low Voltage Buyout Reconciliation
- MCR0047a PCI00483A PH3 ASI #38r2 - WPI Wall Dimension Changes
- MCR0029a PCI00356A PH3 Dimension and Modeling Corrections Time Impact
- MCR0057 PH3 PCI00538 ASI #48r1 - L03 Layout Revisions
- MCR0058 PCI00540 PH3 ASI #50 - Elev. R1/R2 Struct. Update, Steam Sterilizers Clg., Tile Patterns
- MCR0059 PCI00541 PH3 ASI #51 - L04 Plan Layouts / RFI 297f
- MCR0059 PCI00541 PH3 ASI #51 - L04 Plan Layouts / RFI 297f
- MCR0060 PCI00542 PH3 ASI #55 - Pharmacy Room Pressure Monitors
- MCR0061 PCI00545 PH3 RFI #332 - ECS2 Metal Panels under bridge
- MCR0062 PCI00546 PH3 - RFI #436 - Waste Yard Footing Depth and Wall Height
- MCR0064 PCI00548 PH3 ASI #54 - Plumbing / Beam Conflict Resolution L03 / RFI #448, RFI #449
- MCR0065 PCI00558 PH3 ASI #52 - Civil & Landscape Grading Coordination
- MCR0066 PCI00559 PH3 ASI #57 - Pharmacy Room Pressure Monitors
- MCR0067 PCI00560 PH3 ASI #62 - Smoke Detector Additions at Comms Rooms
- MCR0068 PCI00561 PH3 ASI #63 - LTG Exam and Treatment Switch Relocation
- MCR0069 PCI00562 PH3 ASI #64 - Med Gas Panels - Level 1 Area D - RFI #447
- MCR0070 PCI00563 PH3 ASI #56 - Level 4 Area E - Food Service revised drain size
- MCR0071 PCI00564 PH3 ASI #60 - Med Gas pedestal equipment/MEP Coordination
- MCR0072 PCI00565 PH3 ASI #61 - Revised Sink fixture type in Histology Lab
- MCR0074 PCI00582 PH3 ASI #66 - RFI 496 Response Decontamination Wall Layout
- MCR0076 PCI00589 PH3 ASI #58 - P&A Tunnel - New Electrical Components
- MCR0077 PCI00590 PH3 ASI #59 - L05 Plan Layouts - RFI 358c
- MCR0078 PCI00591 PH3 ASI #67 - Millwork Clarifications - RFI 510 & 513
- MCR0079 PCI00592 PH3 ASI #68 - Ceiling Type Clarifications - RFI 511
- MCR0080 PCI00593 PH3 ASI #65 - RFI 481 Response
- MCR0081 PCI00594 PH3 ASI #72 - ED Mobile Xray Electrical and Technology Coordination
- MCR0082 PCI00595 PH3 ASI #73 - Med gas slide details - RFI 482
- MCR0083 PCI00602 PH3 ASI #76 - L03 Ceiling Height Revisions, RFI 545, 549, 554
- MCR0084 PCI00603 PH3 ASI #78 - Med Gas Outlet Removal - RFI 266b
- MCR0085 PCI00607 PH3 Yearout Buyout Reconciliation
- MCR0086 PCI00610 PH3 - RFI 594 - Waste Disposal Yard CMU Tie-in
- MCR0087 PCI00611 PH3 - RFI 552 - Shower Seat Support Changes
- MCR0088 PCI00612 PH3 RFI 575 Delete Acoustical Barrier Ceilings
- MCR0089 PCI00616 PH3 ASI 70 RFI 418 - Revised Circuit Designations, L05 Area B
- MCR0098 PCI00630 PH3 ASI 94 RFI 585 - Ambulance Bay/Waste Management Grading Clarification
- MCR0090 PCI00619 PH3 ASI 86 RFI 57a - Remove Domestic Water Treatment Schedule
- MCR0091 PCI00620 PH3 ASI 69 RFI 471a - Eyebrow Structural Support
- MCR0092 PCI00622 PH3 ASI 77 RFI 458a - Level 6 Partitions
- MCR0093 PCI00623 PH3 ASI 81 RFI 435, 460 - ED Headwall Coordination
- MCR0094 PCI00625 PH3 Consolidated DFH Changes
- MCR0095 PCI00626 PH3 RFI 590 Bulletproof Glass Head Detail
- MCR0096 PCI00627 PH3 RFI 556 (ASI Pending) Missing Light Fixture Tags
- MCR0097 PCI00629 PH3 ASI 74 - Level 04 Bathroom, Shaft Wall, & Operable Wall Partition Changes
- MCR0098 PCI00630 PH3 ASI 94 RFI 585 - Ambulance Bay/Waste Management Grading Clarification
- MCR0099 PCI00631 PH3 ASI 91 - Removal of QV Series Sheets
- MCR0100 PCI00632 PH3 ASI 71 RFI 387 - Locker Clarifications
- MCR0101 PCI00633 PH3 ASI 80 - Solid Surface Color Revision
- MCR0102 PCI00634 PH3 RFI 609 - Public Waiting 10-013 Fireplace
- MCR0103 PCI00637 PH3 TKE Buyout Reconciliation
- MCR0104 PCI00638 PH3 RFI 555 - Opening 21-001A BBRP Hardware Clarification
- MCR0031 PCI00370 PH3 ASI 29r2
- MCR0127 PCI00692 PH3 ASI 127 - Stair door height revision from 6'-8 to 7'-0
- MCR082b PCI00265b Temp Heat for CUP & Materials Management
- MCR0108 PCI00650 PH3 ASI 79 RFI 402 - Door Hardware Changes
- MCR0032 PCI00386 PH3 ASI 30
- MCR0112 PCI00674 PH3 ASI 53 Sheet Clean-up
- MCR0113 PCI00675 PH3 ASI 106 MP1 Panel Size Updates
- MCR0114 PCI00676 PH3 ASI 83 Finish Plan Updates, RFI 633, Red Line Location and Finish Selection
- MCR0115 PCI00677 PH3 ASI 120 Safe Room Signage
- MCR0116 PCI00678 PH3 ASI 88 UPS B to Critical Power
- MCR0118 PCI00680 PH3 ASI 96 - TDR Specific Rack Elevations
- MCR0119 PCI00681 PH3 ASI 89 - Fan EF-H-9-9 Equipment Update
- MCR0120 PCI00682 PH3 ASI 93r1 - Electric Fireplace Connection
- MCR0122 PCI00684 PH3 ASI 99 Update Fast Track Patient Recliners
- MCR0123 PCI00685 PH3 ASI 84 RFI 591 Body Hold Receptacles
- MCR0124 PCI00688 PH3 ASI 90 - Lighting Coordination Items
- MCR0125 PCI0689 PH3 ASI 103r1 - Medical Equipment Isocenter Locations & L03 OR Metal Panel Wall
- MCR0126 PCI00690 PH3 ASI 82 RFI 431 562 576 592 - OFCI Mtg. Hts.
- MCR0128 PCI00693 PH3 ASI 109 - Connections and circuits for medical gas alarm panels
- MCR0129 PCI00694 PH3 ASI 121 RFI 663 - L02 Bridge Downlights
- MCR0130 PCI00695 PH3 ASI 122 RFI 665 - Patient Room 1% dimming
- MCR0131 PCI00696 PH3 ASI 123 - Exterior Signage - Logo Updates
- MCR0132 PCI00698 PH3 ASI 100 Security Metal Detectors and Portable X-Ray
- MCR0133 PCI00699 PH3 ASI 105 RFI 550c Sanitary Waste and Vent Update
- MCR0134 PCI00700 PH3 ASI 107 RFI 631 Fan Coil Relocation
- MCR0135 PCI00701 PH3 ASI 108 RFI 536 Sheet View Name Revision
- MCR0136 PCI00702 PH3 ASI 126 RFI 678 L07 Dimension Clarifications
- MCR0137 PCI00703 PH3 ASI 101 Linear Diffuser Update at Elevator Lobbies
- MCR0138 PCI00706 PH3 ASI 111 Medical Equipment, B1-117 & B1-120 Gen Rad
- MCR0139 PCI00707 PH3 ASI 110r2 Medical Equipment - 31-051 & 31-053 Hybrid OR
- MCR0140 PCI00708 PH3 ASI 63 Modified Data Ports
- MCR0141 PCI00709 PH3 ASI 125 RFI 673 Missing Dimensions on AI470
- MCR0142 PCI00710 PH3 ASI 92 RFI 739a Parking Structure Equipment Relocation
- MCR0143 PCI00712 PH3 ASI 102 RFI 707 Changes in Wall Type at Isolation Exam B1-172
- MCR0043a PCI00473a PH3 ASI #40 - Early Work Release
- MCR0043b PCI00473b PH3 ASI #40 - Early Material Release
- MCR0105 PCI00639 PH3 ASI 95 RFI 518 Updating CCTV Cable Colors
- MCR0106 PCI00640 PH3 RFI 543 Eyebrow Step Details
- MCR0107 PCI00648 PH3 RFI 593 Opening VB-002B Clarification
- MCR0109 PCI00654 PH3 RFI 382 L2 Pour 6 CJ and Beam Shift
- MCR0110 PCI00657 PH3 ASI 85 - Behavioral Health Door Hardware, Interior Window Locations
- MCR0111 PCI00671 PH3 ASI 87 Hydraulic Elevators
- MCR0117 PCI00679 RFI 237a Telecom T-1B1-A
- MCR0121 PCI00661 PH3 RFI 487 Curtain Wall Head Topout
- MCR0144 PCI00715 PH3 ASI 75 ICU Clean Supply Equipment Revision
- MCR0145 PCI00716 PH3 ASI 128 Medical Equipment 31-085, 31-087
- MCR0146 PCI00718 PH3 ASI 119 Custom Color Sprinkler Head Cover Plates
- MCR0147 PCI00720 PH3 ASI 112 Medical Equipment 31-085 & 31-087
- MCR0148 PCI00724 PH3 ASI 129 Combination FSD Removal & Horizontal Wall Jog at Soiled Utility
- MCR0149 PCI00725 PH3 ASI 118 Soffit Along Concourses
- MCR0150 PCI00727 PH3 ASI 113 - Med Equipment, IR Angio 31-069 & 31-071, Cath 31-077 & 31-079
- MCR0151 PCI00728 PH3 RFI 198C Added 5 Sided Soffit at Equipment Storage 11-035
- MCR0152 PCI00729 PH3 Temp Health Station Fiber Pulls
- MCR0153 PCI00730 PH3 ASI 141 - New AHU Cooling Equipment for UPS
- MCR0154 PCI00731 PH3 ASI 103 - Med Eq Isocenter Locations and L03 OR Metal Panel Wall System
- MCR0155 PCI00732 PH3 ASI 112 - Medical Equipment 31-085 and 31-087
- MCR0156 PCI00733 PH3 ASI 111 - Medical Equipment B1-117 and B1-120 Gen Rad
- MCR0157 PCI00721 PH3 RFI 731 - Condensate Clean Outs
- MCR0158 PCI00734 PH3 ASI 130 Final coordination hardware revisions for Levels B01, L01, L02
- MCR0009d PCI00251d PH3 ASI 10
- MCR0159 PCI00739 PH3 ASI 114 - Medical Equipment, 11-081 & 31-081
- MCR160 PCI00448 PH2 ASI 52r - Code Analysis & Landscape Revisions
- MCR0149 PCI00725 PH3 ASI 118 Soffit Along Concourses
- MCR0161 PCI00754 PH3 ASI 98 - TDR Layout Updates, PA Panels to Racks & Rack Recpt. to 5-wire
- MCR0165 PCI00735 RFI 779 - Add CMU wall additions to support overhead doors (B1-001C and B1-001E)
- MCR0166 PCI00762 PH3 ASI 143 Revise ECMO Workroom to ECMO Equipment Room
- MCR0167 PCI00763 PH3 ASI 145 Addition of Fire/Smoke Dampers, L04
- MCR0168 PCI00764 PH3 ASI 142 Water Treatment and Water Heater Room
- MCR0172 PCI00785 PH3 ASI 115 Medical Equipment, B1-113 CT
- MCR0175 PCI00805 PH3 ASI 134 RFI 758 Nurse Call Head End Cabinet Circuit Revisions
- MCR0176 PCI00806 PH3 ASI 136 Typical Device Elevation Locations
- MCR0177 PCI00807 PH3 ASI 137 Confirming location of exterior WAPs, OIS 189
- MCR0181 PCI00820 PH3 ASI 104 Patient Floor Lobby Lighting and Ceiling Coordination
- MCR0182 PCI00815 PH3 RFI 977 Delete Stucco @ Waste Enclosure
- MCR0184 PCI00821 RFI 627a - MDF BC-005 wall fur out
- MCR0185 PCI00774 PH3 RFI 837 VAV-B-2-37 Reheat Coil Clarification
- MCR0187 PCI00761 RFI 851 - Modify Opening VB-002 & VB-002C
- MCR00188 PCI00851 PH3 ASI 135 Vertical Opening Modifications
- MCR00189 PCI00852 PH3 ASI 155 wall, door, and window leaded-type designation in ORs & window type re
- MCR00190 PCI00853 PH3 ASI 124 Exterior RFI Integration
- MCR00191 PCI00854 PH3 ASI 139 new data outlets to Neuro diagnostics Workroom 42-077
- MCR00192 PCI00855 PH3 ASI 116 Medical Equipment, Central Sterile
- MCR00193 PCI00856 PH3 ASI 151 Medical Equipment, CT, B1-112 & 11-059
- MCR00197 PCI00868 PH3 ASI 158 Partial Height Wall Locations and Support
- MCR0200 PCI00872 PH3 ASI 156 Helipad Snow Melt Implementation
- MCR0208 PCI00893 - WPI HWA
- MCR0210 PCI00860.1 - Progressive Roofing Buyout Reconciliation
- MCR0211 PCI00908 PH3 ASI 160 Access Control Door Hardware Coordination
- MCR0212 PCI00909 PH3 ASI 161 Timeclock LAN Outlet Connections
- MCR0214 PCI00773 RFI 843a - Add room pressure monitors
- MCR0217 PCI00930 RFI 961 - Add future P-tube connection per owner request
- MCR0220 PCI00929 RFI 1167 - CW header at BBRP Bridge
- MCR0221 PCI00937 PH3 RFI1086a - OFCI Scrub Sink, CAD ID Confirmation,L03 ORs - B01 Traumas
- MCR0222 PCI00938 PH3 RFI 1081 - Additional Electrical Power required for L02 Food Service
- MCR0223 PCI00939 PH3 RFI 1151 - PACU Chief Box Location and Backing
- MCR0225 PCI00943 Level 2 Coffee Bar Buyout Reconciliation
- MCR0226 PCI00947 PH3 RFI 722 - Curb Wall Removal
- MCR0229 PCI00949 PH3 RFI 1132 AED and Cabinet Locations
- MCR0230 PCI00951 PH3 RFI 1155 - Door Frame Protection & Door Edge Guard Height Clarification
- MCR0231 PCI00953 PH3 ASI 152 Medical Equipment, MRI
- MCR0232 PCI00954 PH3 ASI 144 Dialysis Drain Piping Specifications Update
- MCR0233 PCI00956 PH3 Fire Smoke Damper Design Impact
- MCR0234 PCI00957 PH3 RFI 1213 - Opening 31-081A and 31-077AA Dimension Changes
- MCR0235 PCI00958 PH3 RFI 974 Stair #3 Overhang at L1
- MCR0236 PCI00959 PH3 RFI 1137 South Wall Telehealth B1001A
- MCR0237 PCI00961 PH3 RFI 1218 W1/W2 Guide Rail Attachment at L3
- MCR0238 PCI00960 PH3 RFI 1219 West Side Ribbon Window Kicker Attachment Details
- MCR0239 PCI00963 PH3 RFI 1223 Additional Divider Beams in T1/T2 and S1/S2 Elevator Pits
- MCR0240 PCI00964 PH3 RFI 1126 - Added Soffit at Level 2 South Curtainwall
- MCR0241 PCI00965 PH3 RFI - Electrical and Tech RCPT Changes from FF to Wall Outlet
- MCR0243 PCI00967 PH3 - Miller Bonded Buyout Reconciliation
- MCR0244 PCI00970 PH3 ASI 172 Isolation Room Ceiling Changes
- MCR0245 PCI00971 PH3 ASI 149 Repurpose Behavioral Health to Exam Room
- MCR0246 PCI00972 PH3 ASI 153 Medical Equipment, IR Angio/Hybrid 31-072 & 31-073
- MCR0247 PCI00973 PH3 ASI 147 Low Voltage Remodel Boxes
- MCR0248 PCI00968 Corbin's buyout reconciliation
- MCR0249 PCI00974 RFI 1244 - Restroom floor tile change
- MCR0250 PCI00975 PH3 RFI #973 - 5-sided shaft enclosure above room 11-055
- MCR0251 PCI00977 PH3 RFI 1190 - Lighting Circuit Overloaded
- MCR0252 PCI00980 PH3 RFI 1236 enclosure type and remote driver location for Y1W fixtures
- MCR0253 PCI00982 PH3 ASI 140 Walk-in Refrigerator at L02
- MCR0254 PCI00981 PH3 RFI 1214 - PACU Headwall in Conflict with FVC
- MCR0255 PCI00983 PH3 ASI 163 Water Mitigation Detail at FAES Elevators
- MCR0256 PCI00984 PH3 ASI 148 SkyTron Light and Boom Updates
- MCR0257 PCI00987 PH3 RFI 1254 Penthouse Deck leave Out Framing and Layout - Roof Access Panels
- MCR0258 PCI00988 PH3 RFI 1193 -Additional Tea Urn Electrical-Plumbing Requirements L02
- MCR0259 PCI00989 PH3 RFI #1229 - Opening B0-003 Structural & Architectural Height Conflict
- MCR0261 PCI00991 PH3 RFI#1224 - Level 3 - PACU Headwall Conflicts
- MCR0262 PCI00992 PH3 RFI #1250 - Condensate Pumps Needed for FCUs - Per FCU
- MCR0263 PCI00993 PH3 RFI 909c - Wood Doors at B1-001A Bullet Resistant and Fire Rating Conflict
- MCR0264 PCI00994 PH3 RFI 1160 Mechanical Opening Pour Back Detail
- MCR00265 PCI00996 PH3 RFI 1138- Overcurrent protection required via secondary tap rule
- MCR0266 PCI01001 PH3 RFI#1179 - Atrium Diffusers - Titus FT-10 - Confirmation
- MCR0267 PCI01003 PH3 RFI #1196 Laminated Glass Pricing for 13B and 13C Mirrors
- MCR0268 PCI01004 PH3 RFI#1122a - AHU-H-9-1 – Outside Air Intake Filter Housing – Structural Support
- MCR0269 PCI00817 PH3 RFI 420 Additional Sealing at Drift Joints
- MCR0270 PCI00911 PH3 RFI 1090a DHX-1 & 2 Not Shown
- MCR0271 PCI00846 PH3 RFI 941 & 941a Steel Angle for Parking Bridge CW Support
- MCR0272 PCI01006 PH3 RFI 1097 Lvl 4 Framing at Top of Beam
- MCR0273 PCI01008 PH3 RFI 1265 - Distribution Panel to Iso Panel Breaker Discrepancies
- MCR0274 PCI01011 PH3 Submittal #0835 - 2x6 Blocking at Wood Sliding Door Assembly Requirement
- MCR0275 PCI00772 PH3 RFI 900 Fast Track & Exam Room Headwall Conflict
- MCR0276 PCI00789 PH3 RFI 889 ED Top of Curtainwall Connection
- MCR0277 PCI00790 PH3 RFI 0942 Beams Penetrating Curtainwall at Canopy
- MCR0278 PCI00838 PH3 RFI 951 Credit APIC LV- removal of redundant CRs at pairs of elevators,all LVLs
- MCR0279 PCI00841 PH3 RFI 1000 - Level 1 - Thermostat Clarifications
- MCR0280 PCI00843 PH3 RFI 1007 - Receptacle and Framing Conflict
- MCR0281 PCI00845 PH3 RFI's 0797, 1018, and 1030 Added Bent Plates
- MCR0282 PCI00863 PH3 RFI 1044 Removal of Casework in Hybrid and Cardiac Operating Rooms
- MCR0283 RFI 1097 - L04 Curtainwall steel framing repair
- MCR0284 PCI00885 PH3 RFI 1131 HSS Curtainwall Support at ED Vestibule
- MCR0285 PCI00890 PH3 RFI 1096 Floor Sink at Heat Exchangers - Basement, Area G
- MCR0286 PCI00904 PH3 RFI 1092 - Medical Gas Vents & Exhaust Penetrations - Observation #126
- MCR0287 PCI01012 PH3 RFI #1272 - Supply Storage 21-193 Wall - Plumbing
- MCR0288 PCI00907 PH3 RFIs 516, 517, 519/519a, 520/1113, 522, 523, and 524 Added Blocking for Signage
- MCR0289 PCI00910 PH3 RFI 0849a - Heat Trace at PG Bridge - Location, Panel & Circuit Designations
- MCR0290 PCI00917 PH3 RFI 1141 Adjust Wall @ B1-205
- MCR0291 PCI00928 PH3 RFI 1028a- Added Electrical Circuit & Data Drop for Emergency Responder Equip.
- MCR0292 PCI00932 PH3 RFI 1150 - Wood Sliding Door Assemblies Submittal Comments Clarification
- MCR0293 PCI00935 PH3 RFI 1158 - Air Curtain Ceiling Conflict at B1-140 ANTE Room - Basement, Area B
- MCR0294 PCI01013 PH3 RFI #1283a - Make Up Water for Snow Melt – Not on Plumbing Drawings
- MCR0295 PCI01014 PH3 RFI #1263 - Plenum Shaft Detail – Shaft-012
- MCR0296 PCI01015 PH3 ASI 170 Hybrid OR Flooring Revision
- MCR0297 PCI01016 PH3 ASI 173 Mechanical Dampers L03 - Damper Material ONLY
- MCR0298 PCI01017 PH3 ASI 180 Lab Transaction Window Counter Height
- MCR0299 PCI01018 PH3 RFI #1056a - Missing Fire Smoke Damper Electrical Req in Basement
- MCR0300 PCI01019 PH3 ASI 159 Landscape Changes per RFI 800
- MCR0301 PCI01020 PH3 ASI 168 Owner Provided Physicist Reports
- MCR0302 PCI01021 PH3 RFI #459b - Overtime Work to Install Behavioral Health Doors
- MCR0303 PH3 RFI 1083 Tap Rule for Secondary Feeders from Transformers
- MCR0304 PCI01023 PH3 RFI 1298 - Panel PNLBWE Factory Divider and 2Pole Breaker Conflicts
- MCR0305 PCI01024 PH3 RFI 1221 - Electrical Keyed Note Coordination and Information Missing
- MCR0306 PCI01025 PH3 RFI #578 Concrete Curb at Stair 2 Level 4
- MCR0307 PCI01026 PH3 RFI #1204 Missing FSD - Level 2, Area D, Shaft 15
- MCR0308 PCI01027 PH3 RFI #1173 - Missing Med Gas Alarm Panel Location – Level 3, Area E
- MCR0309 PCI01028 PH3 RFI #1289 - Access Doors for Shafts Next to SH-005 - Level 1, Area C
- MCR0310 PCI01029 PH3 RFI #1271 - Stair 8, Shaft-03 at Level 4, Area F - Fire Rating
- MCR0311 PCI01030 PH3 RFI #1266a - Central Sterile - 2" Sanitary Pipe - Level 2, Area A
Phase 2
- MCR099 PCI00309 PH2 ASI 39 - Vault Revisions 28, 29 & XC
- MCR098 PCI00305 PH2 ASI 38 - Concrete Encased Conduit
- MCR097 PCI00290 RFI 296a Added Counterweight Screens
- MCR096 PCI00292 RFI 434 - Deletion of Plywood @ Electrical Rooms
- MCR095 PCI00276 - RFI 390 Phase II Fall Protection at Opening 21-005
- MCR094 PCI00285 PH2 ASI 37
- MCR093 PCI00284 RFI 381 - Revised Kick Braces @ CUP roof
- MCR089 PCI00228 PH2 ASI 30 - Misc Items
- MCR088 PCI00240 PH2 ASI 29 - Interiors / Paint Updates, Piping & Rocky's ramp
- MCR087 PCI00232 PH2 ASI 26 - Added area drains and increased feeder sizes
- MCR086 PCI00230 PH2 ASI 23 - Electrical Revisions related to Submittal 164
- MCR085 PCI00190 PH2 ASI 21 - Metal Panel & Lighting Changes
- MCR084 PCI00170 PH2 ASI 17
- MCR083 PCI00143 PH2 ASI 12 - Reconfig of Elect, IT and Bicycle Storage & Other
- MCR080 PCI00263 PH2 ASI 34 - Misc. Revisions
- MCR074 PCI00252 ASI 33 Plumbing & Finish Revisions
- MCR073 PCI00238 ASI 32 - Vault Revisions 30, 31 & XD
- MCR072 PCI00237 ASI 31 - Mechanical & Electrical Revisions
- MCR082 PCI00265 EPA Permit
- MCR100 PCI00268 RFI 400 - Gas Meter Relocation
- MCR101 PCI00314 PH2 ASI 40 - Precast Stain Elevations & Details
- MCR105 PCI00275 RFI 356 - Elevator Wall Furr-out
- MCR102 PCI00319 RFI 474 Concrete Curb Around IT Conduits
- MCR103 PCI00321 PH2 ASI 41 - Signage Revisions
- MCR104 PCI00322 PH2 ASI 42 - Elevator Divider Beams
- MCR105 PCI00275 RFI 356 - Elevator Wall Furr-out
- MCR106 PCI00334 RFI 334 - Add'l Stair 5 Lights
- MCR107 PCI00298 - RFI 347 Garage CMU Wall
- MCR108 PCI00336 RFI 499 - Partitions at Bike Storage
- MCR109 PCI00300 RFI's 213a & 439 Wall Changes @ GE-002
- MCR110 PCI00330 RFI 489 - FCU-PG-10 Missing Thermostat
- MCR111 PCI00299 Added Fault Indicators
- MCR112 PCI00342 Transfer Buyout Savings
- MCR113 PCI00301 - RFI 437 Wall Type Clarifications
- MCR114 PCI00287 - RFI 420 Wall Type Confirmation at Electrical and IT Rooms
- MCR115 PCI00347 RFI 515 - Phase II Painting of Fire Sprinkler Piping
- MCR116 PCI00352 RFI 492 Added Motor Starters for Inline Pumps
- MCR118 PCI00363 PH2 ASI 43
- MCR119 PCI00340 RFI 503a 510 - FP in Elevator Shafts & Machine Rooms
- MCR121 PCI00369 PH2 ASI 44 - Cooling Tower Spring Isolators
- MCR122 PCI00379 RFI 547 - Breaker Control Panel & UPS in SWGR WNK2CA & WNK2CB
- MCR124 PCI00375 PH2 ASI 46 - Fuel Oil Room Exhaust
- MCR123 PCI00384 RFI 534 North Bi-fold Gate
- MCR126 PCI00389 BBRP Walk Pads
- MCR125 PCI00365 RFI 524 - East Loading Dock CMU Wall Head Angles
- MCR127 PCI00341 RFI 321 - Overhead Coiling Doors
- MCR122a PCI00379a RFI 547a - Breaker Control Panel & UPS in SWGR WNK2CA & WNK2CB
- MCR128 PCI00400 RFI 565 MTR Room Fire Dampers
- MCR130 PCI00398 RFI 544 - South Canopy Roofing Structure Support
- MCR129 PCI00401 RFI 551 Added Tube Steel Supports for Louver
- MCR135 PCI00403 RFI 540 Coiling Grille Column Supports
- MCR138 PCI00411 RFI 543 MTR Room Modifications
- MCR133 PCI00392 PH2 ASI 48 - Boiler Flue
- MCR133a PCI00392a PH2 ASI 48 Additional costs
- MCR136 PCI00404 RFI 583a - West Entrance Wing Walls
- MCR134 PCI00295 PH1 ASI 7r2 - Install 2" for SCADA
- MCR142 PCI00408 RFI 549 - Panic Hardware in CUP Electrical Room
- MCR139 PCI00416 PH2 Additional HC Signage Posts
- MCR140 PCI00413 Steel Angle @ Expansion Joints (ASI 34, RFI 359 & 576)
- MCR146 PCI00430 RFI 584 Alternate Roof Detail
- MCR144 PCI00429 RFI 427 UPS Budget
- MCR145 PCI00415 RFI 567 Lighting on 2nd Level at Elevators P1 & P2
- MCR082a PCI00265a PH2 Temp Air for Startup
- MCR147 PCI00366 PH3 RFI 110 Existing Manholes 7 & 8
- MCR131 PCI00395 Damaged Gas Riser North of CUP
- MCR132 PCI00378 PH2 ASI 47r - Boiler Flue Platform
- MCR137 PCI00383 Coreslab COVID Impacts
- Phase 1 - CM Reserve Reconciliation 01
- Phase 2 - CM Reserve Reconciliation 01
- MCR143 PCI00423 PH2 ASI 49 - MTR Rack Changes and TDR-GA Post Modifications
- MCR148 PCI00447 RFI 612 - Manhole Cover Adjustments
- MCR151 PCI00453 RFI 518b Sixth Floor Guardrail
- MCR150 PCI00435 RFI 634 - Metal Deck Attachment
- MCR154 PCI00462 RFI 493 Extending Feeders for Generator
- MCR152 PCI00459 PH2 Shark Meters
- MCR153 PCI00399 RFI 566 - Ground Level Under Precast Ramps Between Gridlines A & B
- MCR156 PCI00432 RFI 629 Gap in South Wall EVS 11-008
- MCR0082 PCI00265 EPA Permit
- MCR155 PCI00467 PH2 Receptacle Identifiers
- MCR166 PCI00472 RFI 548c Relocate BMS Workstation
- MCR165 PCI00424 RFI 614 Access Control Panel Relocate
- MCR164 PCI00358 RFI 229 WAP Cable Count Reduction
- MCR163 PCI00357 RFI 160 Television Scope of Work
- MCR158 PCI00412 RFI 488 Camera Mount Changes
- MCR157 PCI00431 RFI 617 Lights in South Entry Canopy
- MCR169 PCI00297 Transfer Remaining Phase 1 Budget to Phase 2
- MCR168 PCI00480 RFI 574 Finish Clarification Call Station Boxes
- MCR167 PCI00471 RFI's 475 & 587 Manholes XB, 26 & 27
- MCR161 PCI00470 PH2 ASI 53 - Misc Electrical Items
- MCR170 PCI00482 RFI 676 Bi-Fold Gate Stop Post North Entry
- MCR172 PCI00477 RFI 626 Blue & Elevator Phone Cabling
- MCR159 PCI00437 PH2 ASI 51 - ADA Parking, Parking Graphics and Signage
- MCR160 PCI00448 PH2 ASI 52r - Code Analysis & Landscape Revisions
- MCR171 PCI00489 PH2 ASI 55 - Wire Mesh Infill Panels
- MCR178 PCI00510 RFI 566a More Wire Mesh Infill Panels
- MCR179 PCI00511 RFI 359 - Trim HHW Pump Impellers
- MCR181 PCI00527 RFI 701 Additional Light Fixtures @ P3/P4
- MCR180 PCI00525 RFI 699 Relocate Exit Lights
- MCR177 PCI00506 PH2 ASI 57 - Patient Parking Signage
- MCR182 PCI00509 RFI 692b Bollard Anchor Details Above Materials Management
- MCR162 PCI00478 PH2 ASI 54 - Fire Protection, Lighting and Mechanical revisions
- MCR173 PCI00492 PH2 ASI 56 - Landscape Sleeve Req. @ West Garage Entrance
- MCR183 PCI00532 PH2 ASI 58 Expansion Joint Covers at Elev 5 & 6
- MCR162 PCI00478 PH2 ASI 54 - Fire Protection, Lighting and Mechanical revisions
- MCR186 PCI00570 PH2 ASI 61 - CUP Bypass Pipes
- MCR190 PCI00598 RFI 741a - Comcast Power Relocation
- MCR189 PCI00596 Existing Garage Demolition - Generator and G&W Switch and Transformer
- MCR194 PCI00605 PH2 - North Entrance Concrete Apron
- MCR184 PCI00553 PH 2 ASI 59 - Cart Storage MEP & Fire Alarm Mods
- MCR191 PCI00580 RFI 708 & Misc Signage Requests
- MCR192 PCI00535 RFI 712 Roof Top Camera Mounts
- MCR193 PCI00609 RFI 731 Delete OHD Card Readers
- MCR198 PCI00645 RFI 734a Circuits Feeding FOP's
- MCR197 PCI00644 RFI 749a AFF Elevations for PA Pendants
- MCR190 PCI00598 RFI 741a - Comcast Power Relocation
- MCR199 PCI00551 RFI 730 - Guard Shack Power
- MCR196 PCI00618 PH2 ASI 62 - Boiler Flue Emission Test Ports
- MCR187 PCI00581 RFI 714 Bollards at Daikin Units
- MCR188 PCI00572 RFI 295c - Revised AED's
- MCR188 PCI00572 RFI 295c - Revised AED's
- MCR195 PCI00604 PH2 Noel/Square Root Surveying & Layout
- MCR204 PCI00697 RFI 327 Genset Pedestals for Feet
- MCR205 PCI00621 RFI 743a Deflector Sheave and Motor Embeds
- MCR082b PCI00265b Temp Heat for CUP & Materials Management
- MCR082c PCI00265c Permanent Temporary Hookups
- MCR203 PCI00571 RFI 725b & 732 - PDU and Circuit for PTZ Camera
- MCR206 PCI00708 PH2 ASI 63 Modified Data Ports
- MCR207 PCI00713 PH2 ASI 64 Lighting Control
- MCR208 PCI00745 PH2 Landscaping on Yale
- MCR209 PCI00753 - PTZ Aux Power Supplies
- MCR212 PCI00769 PH2 Additional Permit Costs for ASI 59r2
- MCR0256 PCI00984 PH3 ASI 148 SkyTron Light and Boom Updates